Maximization of solution flexibility for robust shop scheduling, European Journal of Operational Research, vol.165, issue.2, pp.314-328, 2005. ,
DOI : 10.1016/j.ejor.2004.04.004
Approche simulatoire, Ordonnancement de la Production, 2001. ,
Introduction, Flexibilité et robustesse en ordonnancement -Traité IC2, 2004. ,
URL : https://hal.archives-ouvertes.fr/hal-00445444
A new method for workshop real time scheduling, International Journal of Production Research, vol.5, issue.6, pp.1555-1579, 1996. ,
DOI : 10.1287/opre.25.1.45
A branch and bound algorithm for the job-shop scheduling problem, Discrete Applied Mathematics, vol.49, issue.1-3, pp.1-3, 1994. ,
DOI : 10.1016/0166-218X(94)90204-6
Flexible Manufacturing Systems: A Review of Analytical Models, Management Science, vol.32, issue.7, 1986. ,
DOI : 10.1287/mnsc.32.7.890
A fuzzy dispatching strategy fordue-date scheduling of FMSs with information delays, International Journal of FlexibleManufacturing Systems, vol.18, issue.1, pp.29-53, 2006. ,
The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey, The International Journal of Advanced Manufacturing Technology, vol.19, issue.11, pp.830-849, 2002. ,
DOI : 10.1007/s001700200095
An approach for real time scheduling for activities with time and resource constraints Advances in project scheduling, 1989. ,
Un apport de flexibilité séquentielle pour l'ordonnancement robuste, 2003. ,
Critical Chain Gestion de contraintes et expertise dans les stratégies d'ordonnancement, 1997. ,
Resource constrainedprojectscheduling: an experimental investigation of heuristicscheduling techniques (supplement), 1984. ,
Scheduling: Theory, Algorithms, and Systems, 2008. ,
Coopération homme-machine pour l'ordonnancement sous incertitudes, 2008. ,
A study on the group scheduling method in regards with transportation in an industrial FMS, IEEE International Conference on Systems, 2007. ,
Best-Case Lower Bounds in a Group Sequence for the Job Shop Problem, Proceedings of the 17th IFAC World Congress, 2008. ,
DOI : 10.3182/20080706-5-KR-1001.02518
URL : https://hal.archives-ouvertes.fr/hal-00410124
A New Human-Machine System for Group Scheduling, Proceedings of International Conference on Industrial Engineering and Systems Management, 2008. ,
Design of Scheduling Algorithms: Applications, Behavioral Operations in Planning and Scheduling, pp.371-411, 2010. ,
DOI : 10.1007/978-3-642-13382-4_15
Ordonnancement d'atelier en temps réel : d'ORABAID à ORDO. Revue d'automatique et de productique appliqués, pp.683-713, 1995. ,
Main sources of inacurratedetermination, uncertainty andimprecision in decisionmodels, Mathematical and Computer Modelling, vol.12, pp.10-11, 2005. ,
A fuzzy logic modelling of dynamic scheduling in FMS, International Journal of Production Research, vol.44, issue.11, pp.2183-2203, 2006. ,
DOI : 10.1016/0166-218X(94)00139-5
Aide à la décision pour l'ordonnancement d'atelier en temps réel, 1980. ,
A classification of predictive-reactive project scheduling procedures, Journal of Scheduling, vol.56, issue.2, pp.195-207, 2007. ,
DOI : 10.1007/s10951-007-0011-2
A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness, Operations Research, vol.47, issue.1, pp.113-124, 1999. ,
DOI : 10.1287/opre.47.1.113