C. Artigues, J. Billaut, and C. Esswein, Maximization of solution flexibility for robust shop scheduling, European Journal of Operational Research, vol.165, issue.2, pp.314-328, 2005.
DOI : 10.1016/j.ejor.2004.04.004

G. Bel and J. Cavaillé, Approche simulatoire, Ordonnancement de la Production, 2001.

J. Billaut, A. Moukrim, and E. Sanlaville, Introduction, Flexibilité et robustesse en ordonnancement -Traité IC2, 2004.
URL : https://hal.archives-ouvertes.fr/hal-00445444

J. Billaut and F. Roubellat, A new method for workshop real time scheduling, International Journal of Production Research, vol.5, issue.6, pp.1555-1579, 1996.
DOI : 10.1287/opre.25.1.45

P. Brucker, B. Jurisch, and B. Sievers, A branch and bound algorithm for the job-shop scheduling problem, Discrete Applied Mathematics, vol.49, issue.1-3, pp.1-3, 1994.
DOI : 10.1016/0166-218X(94)90204-6

J. A. Buzacott and D. D. Yao, Flexible Manufacturing Systems: A Review of Analytical Models, Management Science, vol.32, issue.7, 1986.
DOI : 10.1287/mnsc.32.7.890

R. Caprihan, A. Kumar, and K. E. Stecke, A fuzzy dispatching strategy fordue-date scheduling of FMSs with information delays, International Journal of FlexibleManufacturing Systems, vol.18, issue.1, pp.29-53, 2006.

F. T. Chan, H. K. Chan, and H. C. Lau, The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey, The International Journal of Advanced Manufacturing Technology, vol.19, issue.11, pp.830-849, 2002.
DOI : 10.1007/s001700200095

J. Erschler and F. Roubellat, An approach for real time scheduling for activities with time and resource constraints Advances in project scheduling, 1989.

C. Esswein, Un apport de flexibilité séquentielle pour l'ordonnancement robuste, 2003.

E. M. Goldratt and C. Guérin, Critical Chain Gestion de contraintes et expertise dans les stratégies d'ordonnancement, 1997.

S. Lawrence, Resource constrainedprojectscheduling: an experimental investigation of heuristicscheduling techniques (supplement), 1984.

M. L. Pinedo, Scheduling: Theory, Algorithms, and Systems, 2008.

G. Pinot, Coopération homme-machine pour l'ordonnancement sous incertitudes, 2008.

G. Pinot, O. Cardin, and N. Mebarki, A study on the group scheduling method in regards with transportation in an industrial FMS, IEEE International Conference on Systems, 2007.

G. Pinot and N. Mebarki, Best-Case Lower Bounds in a Group Sequence for the Job Shop Problem, Proceedings of the 17th IFAC World Congress, 2008.
DOI : 10.3182/20080706-5-KR-1001.02518

URL : https://hal.archives-ouvertes.fr/hal-00410124

G. Pinot, N. Mebarki, and J. M. Hoc, A New Human-Machine System for Group Scheduling, Proceedings of International Conference on Industrial Engineering and Systems Management, 2008.

J. Riezebos, J. Hoc, N. Mebarki, C. Dimopoulos, W. Van-wezel et al., Design of Scheduling Algorithms: Applications, Behavioral Operations in Planning and Scheduling, pp.371-411, 2010.
DOI : 10.1007/978-3-642-13382-4_15

F. Roubellat, J. Billaut, and M. Villaumie, Ordonnancement d'atelier en temps réel : d'ORABAID à ORDO. Revue d'automatique et de productique appliqués, pp.683-713, 1995.

B. Roy, Main sources of inacurratedetermination, uncertainty andimprecision in decisionmodels, Mathematical and Computer Modelling, vol.12, pp.10-11, 2005.

P. Srinoi, E. Shayan, and F. Ghotb, A fuzzy logic modelling of dynamic scheduling in FMS, International Journal of Production Research, vol.44, issue.11, pp.2183-2203, 2006.
DOI : 10.1016/0166-218X(94)00139-5

V. Thomas, Aide à la décision pour l'ordonnancement d'atelier en temps réel, 1980.

S. Van-de-vonder, E. Demeulemeester, and W. Herroelen, A classification of predictive-reactive project scheduling procedures, Journal of Scheduling, vol.56, issue.2, pp.195-207, 2007.
DOI : 10.1007/s10951-007-0011-2

S. D. Wu, E. Byeon, and R. H. Storer, A Graph-Theoretic Decomposition of the Job Shop Scheduling Problem to Achieve Scheduling Robustness, Operations Research, vol.47, issue.1, pp.113-124, 1999.
DOI : 10.1287/opre.47.1.113